Thursday, February 28, 2008

Update on shed power inspection failure

Just called the inspector this morning. The entire length of PVC needs to be at least 18 inches below grade. To get around this requirement I need to bury the pipe in cement whereever it is less than 18 inches deep.

What a pain.

No comments: